Drawings in. A supplier-ready order out, in seconds.
The AI maps each assembly to its CSI division, runs the quantity takeoff with waste factors, prices it against live Ontario supplier rates and flags long-lead items before they wreck the schedule. Press run.
Takeoff time
3 days
Pricing accuracy
71%
Order total
$0
Lead-time flags
0
Assemblies
North York build
1
Read
60 by 40 ft footprint, 2 stories
2
Map
Assemblies to CSI divisions
3
Quantify
Takeoff with 16 in o.c. rules
4
Price
Live supplier catalogue, lead times
Supplier-ready order
Home Hardware · Vaughan
Total incl. HST · Net-30$0.00
Toggle assemblies, then run. Long-lead items get flagged automatically.
The impact
A three-day takeoff in the time it takes to read the drawing.
Quantities, waste factors and live supplier pricing land in one pass, so bids go out faster and the math holds up.
Typical projectionResidential construction · industry benchmark
Time per takeoff
3 days→90 sec
▲ plans to priced order in one pass
Quantity and pricing accuracy
71%→99%
▲ waste factors and o.c. rules applied
Long-lead items caught
0→flagged
▲ before they wreck the schedule
Projection, not a guaranteed result. Typical estimated range for businesses in this sector based on typical volume. Individual results vary. Shown as system capability, not a specific client case.