TRIVOX
Production Scheduling + Quality
TRIVOX Manufacturing
← All demos
Shop floor · Plan and inspect

The line schedules itself, and catches the bad part.

The AI sequences every work order across machines for max throughput, reroutes around a down line, and logs each quality check, holding the lot the instant a reading drifts out of spec. Press run.

Throughput
0%
Utilization
0%
On-time
0%
Scrap rate
2.1%

Machine schedule · today

auto-sequenced
CNC-01
WO-2231
WO-2240
WO-2255
PRESS-02
WO-2233
reroute
WO-2261
WELD-03
WO-2238
WO-2244
WO-2259
PAINT-04
WO-2235
WO-2249
WO-2263

Quality log · inline checks

SPC
WO-2231 · bore dia
12.00mm ±0.02 · read 12.01
WO-2238 · weld penetration
spec 4.0mm · read 4.2
WO-2240 · surface finish
Ra 1.6 · read 2.9 drift
WO-2244 · torque
35Nm ±2 · read 35.4
Sequenced for throughput. Out-of-spec lot held, supervisor pinged.
The impact

More good parts off the line, fewer bad ones shipped.

Auto-sequencing across machines lifts weekly throughput while inline SPC holds the out-of-spec lot before it leaves the floor.

Typical projection Discrete manufacturing · industry benchmark
Machine utilization
76%94%
▲ Reroutes around downtime
Scrap rate
2.1%0.6%
▲ Lot held on drift
On-time completion
87%99%
▲ Sequenced for throughput

Units completed per week

▲ 1,180 / wkLast 6 weeks
With TRIVOX

Projection, not a guaranteed result. Typical estimated range for businesses in this sector based on typical volume. Individual results vary. Shown as system capability, not a specific client case.