TRIVOX
Command Center
TRIVOX Construction
← All demos
Portfolio control · Live cost and schedule

Every job, every dollar, every risk on one screen.

The AI pulls live cost data across your active builds, reconciles committed against actual, scans RFI logs and schedule float, then ranks the risks by dollar impact. Press run and watch it brief you.

Contract value
$233.9M
6 active jobs
Budget burn
51.4%
vs plan
On schedule
50%
of portfolio
Risks flagged
0
awaiting scan

Active projects

Greater Toronto Area

AI risk insights

idle
Run the cycle to let the AI scan Sage 300, reconcile cost vs actual, and surface ranked risks here.

Schedule performance index

1.0 = on plan
3 jobs at or above plan
2 jobs marginally behind
Vaughan TI driving the drag
Risks ranked by dollar impact. Everything else stays green.
The impact

Cost overruns caught while there is still time to fix them.

One screen reconciles committed against actual across every job, so the dollar leaks surface in days instead of at month-end.

Typical projection Commercial construction · industry benchmark
Cost issues surfaced early
Month-end48 hrs
▲ caught the same week
Time to assemble portfolio brief
2 days2 min
▲ pulled live, not by hand
Budget variance flagged per job
Reactive100%
▲ every active build, ranked

Cost risks flagged before they hit the bottom line

▲ 11 / wk peakLast 8 weeks
With TRIVOX

Projection, not a guaranteed result. Typical estimated range for businesses in this sector based on typical volume. Individual results vary. Shown as system capability, not a specific client case.